Part of Sam's 3PL Solutions info@savannah3pl.com

Home / Notes / Drayage and demurrage

Drayage and demurrage

Avoiding demurrage and detention on Savannah boxes

· Savannah3PL

Two container ships alongside gantry cranes at a marine terminal.
Ships under gantry cranes. Unsplash, photo-1578575437130-527eed3abbec. Not the Port of Savannah.

Demurrage and detention get mashed into one complaint. They are different clocks, and mixing them is how a quote leaves out the charge that actually hits. The Federal Maritime Commission oversees how ocean carriers and marine terminals apply these fees. The readable starting point is fmc.gov. This note is the Savannah version of the calendar, not a substitute for the tariff.

Two meters

Demurrage is what the terminal charges when the container sits inside the port past the free time on the terminal side. Detention, often discussed with per diem, is what the equipment owner charges when the container is outside and has not come back. You can pay one, the other, or both. A fast unload does not help if the box never got a gate appointment. A perfect gate appointment does not help if nobody is home to receive it and the container rides around the city.

GPA’s August 11, 2026 release is useful color, not a shield. It reported nearly 15,000 truck transactions a day in July, turn times of 31 minutes for a single move and 51 minutes for a dual, and nearly 80 percent of transactions as dual moves. It also noted the July 15 opening of the Brampton Road Connector into Gate 3. Fluid gates still require a release and an appointment. Dual moves are a port efficiency story. Your empty return still has to be planned.

What to hand the desk before the vessel works

  • Container number, steamship line, and terminal (Garden City or Ocean Terminal).
  • Last free day for both terminal free time and equipment free time, if they differ.
  • Whether customs is released or who is filing. A box that is not released cannot be a heroic dray.
  • The door that will take it, and whether that door is our transload or a warehouse you already use in Pooler, Garden City, Port Wentworth, or Savannah.
  • What “done” means: empty back the same trip, or a drop that returns tomorrow.

Drayage and transloading should be on the same work order when we are doing both. Splitting them across two vendors is a classic way to buy a day of detention in the gap.

What we will not promise

We will not promise that every box beats the clock. Exams, late documents, and a full yard are real. We will tell you early when the appointment and the building do not line up, which is the only moment a fee can still be avoided. After the charge posts, the argument is with the line or the terminal, and the FMC’s rules are the framework for that dispute. A warehouse email does not vacate an invoice.

If you want a second pair of eyes on a last free day this week, send it through the quote form with the dates in the first sentence.

Ask about a shipment